Offshore

Third Party Inspection involving review/witness/inspection/verification of the following activities/stages i.e. pre-fabrication phase, fabrication phase (structural, mechanical/piping, electrical, instrumentation,) installation, hook-up, wrapping/coating & weight coating,  testing, pre-commissioning, commissioning, liquidation of punch points, project monitoring & reporting, verification of as built drawing/as built structure for:
 

  • Process Platforms
  • Living Quarter Platforms
  • Process gas Compressor Modules
  • 24 nos Well Head Platforms
  • Over 1000 kms of rigid and flexible Sub-sea pipelines
  • Topside modifications

Onshore-Plants & Facilities

Third Party Inspection involving review/witness/inspection/verification of the following activities/stages i.e. pre-fabrication phase, fabrication phase (structural, mechanical/piping, electrical, instrumentation,) installation, hook-up, wrapping/coating & weight coating,  testing, pre-commissioning, commissioning, liquidation of punch points, project monitoring & reporting, verification of as built drawing/as built structure for:
 

  • GGS
  • GCS
  • CTF
  • ETP
  • WIP
  • Storage Tanks
  • Cryogenic Tanks & vessels
  • Mounded Bullets
  • 1.3 MTPA Single Stream, 2850 MTPD Ammonia Plant, 3850 MTPD Urea Plant and associated facilities
  • PSA N2 Nitrogen Plant
  • SRU Facilities

Cross Country Pipelines/ City Gas Distribution

Third Party Inspection and Quality Surveillance of:
 

  • about 1750 kms of Gas pipeline of up to 48” and X-80 Grade
  • about 1500 kms of Crude Oil/Product Pipelines

Construction Management- Projects

  • LPG Terminals
  • LPG Bottling Plants
  • Cross Country Pipelines
  • Fertilizer Plants (Urea & Ammonia)
  • Green Building
  • ETP’s, Storage Tanks
  • City Gas Distribution Projects

Line Pipes

Third Party inspection of:
 

  • about 5000 Kms. of HSAW up to API 5L Gr.X-80 PSL2 (Max OD 48 Inch)
  • about 4000 Kms. of LSAW up to API 5L Gr.X-80 PSL2 (Max OD 56 Inch)
  • about 3500 Kms. of ERW up to API 5L Gr. X-70 PSL2 (Max OD 20 Inch)
  • about 450 Kms. of SMLS up to API 5CT P110 (Max OD 12 Inch)

Valves

  • Ball Valves
  • Butterfly valve
  • Dual plate check valve
  • Gate Valve
  • Globe Valve
  • Plug valve
  • Swing Check Valve
  • Thermal relief valve
  • X- Mass Tree

Static Equipment

Third Party Inspection of Static Equipment like:

EQUIPMENT/ITEM EQUIPMENT/ITEM EQUIPMENT/ITEM

Heat Exchangers

Steam Drums

Butane Cooler

Drum & Disk Filters

High Pressure Vessels

Shell & Tube Exchangers 

Air Blast Coolers 

LPG/Propane/Ammonia Tanks

Propane Accumulator

Glycol Flash Vessels

Glycol Surge Vessels

Receivers

Diesel Transfer Filters

Surge Tanks

Air Receiver Vessel

Caustic Settler Vessel

Water Wash Vessels

Spent Caustic Reactors

Glycol Flash Drum & Filters

Regenerator

Heat Exchangers & Re-boilers

Solvent Cooler

Water & Solvent Cooler

Propane Column Condenser

Butadiene Column Condenser

Deisobutenizer Condenser

DP Reactor Feed

DP Reactor Effluent Cooler

Depropylenizer Condenser

LPG Bullets

FRP Vessels

Absorber

Flash Gas Absorber

Feed Gas KO Vessel

Solvent Flash Vessel

Overhead Accumulator Vessel

Lean Solvent Cooler

Lean/Rich Exchanger

Chemical Injection Skids

LEF Column Condenser

Regenerator condense

Regenerator Re-boiler

Vent Condenser

Feed Gas Knock Out Drum

High Pressure  Separator

Low Pressure  Separator

LEF Column Reflux Drum

LPG Column Reflux Drum

Fuel Gas KO Drum

Flare KO Drum

Blow-down Drum

Feed Gas Chiller

LEF Column Reboiler

LPG Column Condenser

LPG Column Reboiler

NGL Cooler

LPG Cooler

Stripper Column

Stripper Column Internal

LPG Column Internal

Rotating Equipments

Third Party Inspection of:
 

  • Compressor Package Unit 1.6 Million SM3/day Electric Motor Driven with all accessories
  • Compressor Package Unit 6 Million SM3/day capacity, Electric Motor Driven with all accessories
  • Compressor Package Unit 350000 SM3/day Electric Motor Driven with all accessories
  • Transfer & Booster Pumps
  • Pump sets–Horizontal Split Case
  • Steam Condensate Transfer Pump
  • Flash Gas Condensate Transfer Pump
  • LPG Transfer Pump
  • Centrifugal pumps and driver
  • Water Booster / Stripping Pumps
  • Wash Water  Pump
  • Atm Condensate Pump
  • SoIvent Drain Pump
  • Pump Briddle Water Collection Sump Pump
  • LEF Column Reflux Pumps
  • LPG Column Reflux Pumps
  • LP Sep. Liquid Pumps
  • Feed Gas Expander - Compressors
  • Off Gas Compressor
  • DM Water Feed Pump
  • CT H2SO4 Dosing Pumps
  • Mercaptan Dosing Pump
  • Mercaptan Unloading Pump
  • Booster Pump
  • Reflux Pump
  • HC drain  Pump

Oil Field Equipment

  • Casing as per API 5CT, ISO 11960 upto 13-3/8 Plain End/Threaded & Coupled with STC, LC & BC Threads
  • Tubing as per API 5CT up to 4 NUE/EUE Plain End/Threaded
  • Intermediate Jt upto 36
  • Wellhead Housing upto 36
  • Casing Hangers and Liner Hangers
  • X-Mas Trees, X-Mas Tree Assembly, Wellheads, Full Bore Valve Assembly, Casing Head Units, Casing Spool Units, Tubing Spool Units,
  • Casing Pipes as per API 5L

Electrical Items

  • Power Transformers, Distribution Transformers
  • Electric Generators
  • Power Generation Turbines
  • HT Motors, LT Motors,
  • HV & MV & LV Switchboard / Switchgear
  • Cables, HT & LT Control Panels, Rectifier Units

Instrumentation Items

  • Pressure Transmitters, Temperature Transmitters, Flow transmitters
  • Pressure Gauges, Level Gauges
  • Flow Computers
  • Turbine Flow Meters, Ultrasonic Flow Meters,
  • Gas Turbine Generator Alarm Panels, Pressure reducing panels
  • H2S Gas Detectors & Alarm Systems
  • DCS & ESD systems with related auxiliaries and accessories
  • Gas Chromatographs
  • Capacitor Banks
  • Battery and Battery charger systems, UPS system
  • Instrumentation cables / control cables
  • PLC based surge panels
 
Our Services